
- Our role
- Full engineering
- Stage
- Completed, 2018
- gross floor area
- 30,000 m²
- steel structure
- 1,200 t
- Our role
- Full engineering
- Stage
- Completed, 2018
A plant that assembles wiring harnesses for cars. Full engineering, including the design.
A plant for the assembly of automotive wiring harnesses in Krepost, Dimitrovgrad Municipality.
Horizont-Ivanov delivered it on a full engineering basis, including the design: steel structure, roof and facades.
174 km from our plant in Pleven, in a straight line.
- roof
- 26,000 m²
- facades
- 6,000 m²
- Investment: by the client
- Design: by us
- Permits: by us
- Fabrication: by us
- Construction: by us
- Maintenance: by us
Photos
Enquire about a similar building
Like Yazaki: 30,000 m² gross floor area, 1,200 t steel structure.
Send an enquiry
- Call us+359 64 882 860
- Email usoffice@horizontivanov.com























