The site from above in the early morning light: the front of the hall is already roofed, over the back the steel girders are still open

ProjectAll projects

Dormakaba

Novi Han, Sofia Province

gross floor area
17,000 m²
steel structure
650 t
Client
Argogroup
Stage
Completed, 2025
gross floor area
17,000 m²
steel structure
650 t
Client
Argogroup
Stage
Completed, 2025

A new Dormakaba plant near Sofia. As a subcontractor to Argogroup, Horizont-⁠Ivanov fabricated and erected the steel structure of SIN beams.

The Swiss group Dormakaba (access, locking and door systems) has built a new production plant in Novi Han.

The steel structure of the building is made of SIN beams, welded girders with a thin corrugated web, and rests on precast reinforced concrete columns. Horizont-⁠Ivanov fabricated it in its own plant and erected it as a subcontractor to Argogroup.

Sheet 1/1Key plan02550 km

125 km from our plant in Pleven, in a straight line.

  1. Investment: by the client
  2. Design: by the client
  3. Permits: by the client
  4. Fabrication: by us
  5. Construction: in part
  6. Maintenance: by the client
The steel structure of SIN beams during erection, 2025: fabricated in our own plant and erected by our own crews.
Dormakaba: fig. 1 of 9
Fig. 1
Dormakaba: fig. 2 of 9
Fig. 2
Dormakaba: fig. 3 of 9
Fig. 3
Dormakaba: fig. 4 of 9
Fig. 4
Dormakaba: fig. 5 of 9
Fig. 5
Dormakaba: fig. 6 of 9
Fig. 6
Dormakaba: fig. 7 of 9
Fig. 7
Dormakaba: fig. 8 of 9
Fig. 8
Dormakaba: fig. 9 of 9
Fig. 9

Enquire about a similar building

Like Dormakaba: 17,000 m² gross floor area, 650 t steel structure.