- Client
- Argogroup
- Our role
- Subcontractor
- Stage
- Completed, 2025
- gross floor area
- 17,000 m²
- steel structure
- 650 t
- Client
- Argogroup
- Our role
- Subcontractor
- Stage
- Completed, 2025
A new Dormakaba plant near Sofia. As a subcontractor to Argogroup, Horizont-Ivanov fabricated and erected the steel structure of SIN beams.
The Swiss group Dormakaba (access, locking and door systems) has built a new production plant in Novi Han.
The steel structure of the building is made of SIN beams, welded girders with a thin corrugated web, and rests on precast reinforced concrete columns. Horizont-Ivanov fabricated it in its own plant and erected it as a subcontractor to Argogroup.
125 km from our plant in Pleven, in a straight line.
- Investment: by the client
- Design: by the client
- Permits: by the client
- Fabrication: by us
- Construction: in part
- Maintenance: by the client