The new factory building from above: a white panel facade, a flat roof with rooflights and truck docks

ProjectAll projects

Tesy

Shumen

gross floor area
8,500 m²
steel structure
450 t
Stage
In progress
gross floor area
8,500 m²
steel structure
450 t
Stage
In progress

The extension of Tesy’s factory in Shumen, which makes heat pump water heaters. Horizont-⁠Ivanov is the general contractor.

The roof of the new building is designed with SIN beams (welded girders with a thin corrugated web) that rest on precast reinforced concrete columns.

Sheet 1/1Key plan02550 km

187 km from our plant in Pleven, in a straight line.

  1. Investment: by the client
  2. Design: by the client
  3. Permits: by the client
  4. Fabrication: by us
  5. Construction: by us
  6. Maintenance: by the client
Tesy: fig. 1 of 12
Fig. 1
Tesy: fig. 2 of 12
Fig. 2
Tesy: fig. 3 of 12
Fig. 3
Tesy: fig. 4 of 12
Fig. 4
Tesy: fig. 5 of 12
Fig. 5
Tesy: fig. 6 of 12
Fig. 6
Tesy: fig. 7 of 12
Fig. 7
Tesy: fig. 8 of 12
Fig. 8
Tesy: fig. 9 of 12
Fig. 9
Tesy: fig. 10 of 12
Fig. 10
Tesy: fig. 11 of 12
Fig. 11
Tesy: fig. 12 of 12
Fig. 12

Enquire about a similar building

Like Tesy: 8,500 m² gross floor area, 450 t steel structure.