A mobile crane lifts a section of the steel space frame canopy into place over the stand

ProjectAll projects

Chiprovtsi Stadium

Chiprovtsi

canopy roof panels
850 m²
steel structure
33 t
Stage
Completed
canopy roof panels
850 m²
steel structure
33 t
Stage
Completed

A stadium canopy. Horizont-⁠Ivanov fabricated and erected its steel structure, the roof panels and the service rooms beneath it.

Horizont-⁠Ivanov fabricated and erected the steel structure of the canopy at the Chiprovtsi stadium, a MArchI-⁠type space frame.

The company also installed the canopy roof panels and built the service rooms beneath it, with a steel structure and roof and wall panels.

Sheet 1/1Key plan02550 km

144 km from our plant in Pleven, in a straight line.

service room panels
500 m²
  1. Investment: by the client
  2. Design: by the client
  3. Permits: by the client
  4. Fabrication: by us
  5. Construction: in part
  6. Maintenance: by the client
Chiprovtsi Stadium: fig. 1 of 8
Fig. 1
Chiprovtsi Stadium: fig. 2 of 8
Fig. 2
Chiprovtsi Stadium: fig. 3 of 8
Fig. 3
Chiprovtsi Stadium: fig. 4 of 8
Fig. 4
Chiprovtsi Stadium: fig. 5 of 8
Fig. 5
Chiprovtsi Stadium: fig. 6 of 8
Fig. 6
Chiprovtsi Stadium: fig. 7 of 8
Fig. 7
Chiprovtsi Stadium: fig. 8 of 8
Fig. 8

Enquire about a similar building

Like Chiprovtsi Stadium: 850 m² canopy roof panels, 33 t steel structure.