The light-coloured steel frame of columns, beams and diagonal bracing above the pipework, seen from below

ProjectAll projects

Amylum – Building Reconstruction

Razgrad

steel structure
280 t
building height
+28.00

Reconstruction of part of a building at Amylum Bulgaria, with a 280 t steel frame. Horizont-⁠Ivanov was the general contractor.

Client
Amylum Bulgaria
Stage
Completed
steel structure
280 t
building height
+28.00
Client
Amylum Bulgaria
Stage
Completed

Reconstruction of part of a building at Amylum Bulgaria, with a 280 t steel frame. Horizont-⁠Ivanov was the general contractor.

Reconstruction of part of an existing building on the Amylum Bulgaria site in Razgrad. Horizont-⁠Ivanov was the general contractor for the architecture, structures, heating and ventilation, plumbing and electrical works, and installed the process equipment.

The work included demolition, earthworks and concrete works, fabrication and erection of the steel structure, floors, platforms and staircases.

The building’s structure consists of a reinforced concrete foundation and a steel frame of columns, beams and diagonal bracing.

Sheet 1/1Key plan02550 km

166 km from our plant in Pleven, in a straight line.

levels
6
  1. Investment: by the client
  2. Design: by the client
  3. Permits: by the client
  4. Fabrication: by us
  5. Construction: by us
  6. Maintenance: by the client
Amylum – Building Reconstruction: fig. 1 of 11
Fig. 1
Amylum – Building Reconstruction: fig. 2 of 11
Fig. 2
Amylum – Building Reconstruction: fig. 3 of 11
Fig. 3
Amylum – Building Reconstruction: fig. 4 of 11
Fig. 4
Amylum – Building Reconstruction: fig. 5 of 11
Fig. 5
Amylum – Building Reconstruction: fig. 6 of 11
Fig. 6
Amylum – Building Reconstruction: fig. 7 of 11
Fig. 7
Amylum – Building Reconstruction: fig. 8 of 11
Fig. 8
Amylum – Building Reconstruction: fig. 9 of 11
Fig. 9
Amylum – Building Reconstruction: fig. 10 of 11
Fig. 10
Amylum – Building Reconstruction: fig. 11 of 11
Fig. 11

Enquire about a similar building

Like Amylum – Building Reconstruction: 280 t steel structure, +28.00 building height.