The multi-storey steel structure of the refinery during erection, with a tower crane and a mobile crane in front

ProjectAll projects

ADM Amylum – New Refinery for the Fructose Plant

Razgrad

built-⁠up area
1,512 m²
steel structure
750 t
Client
ADM Amylum
Stage
Completed
built-⁠up area
1,512 m²
steel structure
750 t
Client
ADM Amylum
Stage
Completed

A new refinery, 28 m high. Horizont-⁠Ivanov was the general contractor: it built the composite slabs and flooring and installed the process equipment.

A new refinery for the fructose plant of ADM Amylum in Razgrad: a multi-⁠level building with a steel structure.

Horizont-⁠Ivanov was the general contractor. It built the composite floor slabs (concrete on profiled steel decking over the steel structure) and the chequer plate flooring, and installed the process equipment.

Sheet 1/1Key plan02550 km

166 km from our plant in Pleven, in a straight line.

height
+28.00
  1. Investment: by the client
  2. Design: by the client
  3. Permits: by the client
  4. Fabrication: by us
  5. Construction: by us
  6. Maintenance: by the client
ADM Amylum – New Refinery for the Fructose Plant: fig. 1 of 10
Fig. 1
ADM Amylum – New Refinery for the Fructose Plant: fig. 2 of 10
Fig. 2
ADM Amylum – New Refinery for the Fructose Plant: fig. 3 of 10
Fig. 3
ADM Amylum – New Refinery for the Fructose Plant: fig. 4 of 10
Fig. 4
ADM Amylum – New Refinery for the Fructose Plant: fig. 5 of 10
Fig. 5
ADM Amylum – New Refinery for the Fructose Plant: fig. 6 of 10
Fig. 6
ADM Amylum – New Refinery for the Fructose Plant: fig. 7 of 10
Fig. 7
ADM Amylum – New Refinery for the Fructose Plant: fig. 8 of 10
Fig. 8
ADM Amylum – New Refinery for the Fructose Plant: fig. 9 of 10
Fig. 9
ADM Amylum – New Refinery for the Fructose Plant: fig. 10 of 10
Fig. 10

Enquire about a similar building

Like ADM Amylum – New Refinery for the Fructose Plant: 1,512 m² built-⁠up area, 750 t steel structure.