Sofia MBT Waste Plant

Gara Yana, Sofia

steel structure
1,200 t
width of the bio-⁠drying hall
35 m
Client
Aktor-⁠Helector consortium
Stage
Completed
steel structure
1,200 t
width of the bio-⁠drying hall
35 m
Client
Aktor-⁠Helector consortium
Stage
Completed

A mechanical-biological (MBT) waste treatment plant. Horizont-⁠Ivanov fabricated and erected the steel structure and the cladding.

Under a contract with the Aktor SA and Helector SA consortium, Horizont-⁠Ivanov fabricated the main steel structure at its plants in Pleven, delivered it and erected it on site. The company also fabricated, delivered and installed roof and wall panels and cladding, trapezoidal sheeting, gutter flashings, the structures of intermediate platforms, stairs and railings.

The works covered the bio-⁠drying, reception, composting and manual and mechanical sorting buildings.

Sheet 1/1Key plan02550 km

118 km from our plant in Pleven, in a straight line.

  1. Investment: by the client
  2. Design: by the client
  3. Permits: by the client
  4. Fabrication: by us
  5. Construction: in part
  6. Maintenance: by the client
Sofia MBT Waste Plant: fig. 1 of 8
Fig. 1
Sofia MBT Waste Plant: fig. 2 of 8
Fig. 2
Sofia MBT Waste Plant: fig. 3 of 8
Fig. 3
Sofia MBT Waste Plant: fig. 4 of 8
Fig. 4
Sofia MBT Waste Plant: fig. 5 of 8
Fig. 5
Sofia MBT Waste Plant: fig. 6 of 8
Fig. 6
Sofia MBT Waste Plant: fig. 7 of 8
Fig. 7
Sofia MBT Waste Plant: fig. 8 of 8
Fig. 8

Enquire about a similar building

Like Sofia MBT Waste Plant: 1,200 t steel structure, 35 m width of the bio-⁠drying hall.